January 7, 1914: First Transit of Panama Canal; 1832: Richmond Filter; 2011: Fluoride Exposure

SS Ancon first official transit of the Panama Canal in 1914. The Alexandre La Valley was an old French crane boat that made the first unofficial transit on 1/7/1914.

January 7, 1914:  “On January 7, 1914 the Alexandre La Valley became the first ship to make a complete transit of the Panama Canal. The Canal is about 50 miles long and uses a system of locks to transport ships through. The locks are 110 feet wide and 1,000 feet long. Between 13,000 and 14,000 vessels use the canal each year, accounting for about 5% of the world trade….The number of ships able to be processed through is limited by the space available. Larger ships are being built and the locks are limited by size. These forces combined are leading to the Panama Canal Expansion Project. Work began on a new set of locks in 2007 and is expected to be completed by 2014.”

Commentary: The water history connection is that the filling of the locks is accomplished by draining water from Gatun Lake that is fed by precipitation in the Panamanian rain forest. Over 26 million gallons of fresh water is lost to the ocean during each downward lock cycle. The new canal system of locks will recycle about 60 percent of the water so there will be less pressure on the local water resources. A terrific blog posted on October 21, 2012, entitled “Panama Canal Update : Why Water is still King” gave a lot of details on the water resources angle of the new canal. I recommend it.

1924 Richmond, Virginia grocery store

January 7, 1832: Completion of the first attempt to filter a public water supply in the U.S.  Filtration was begun in Richmond, VA.  The slow sand filters operated in an  “upflow” mode and consisted of layers of sand and gravel.  The design engineer was Albert Stein who built a downflow filter after the upflow version failed.  Despite the problems, Moses N. Baker declared the Richmond filtration efforts the start of filtration of public water supplies in the U.S.

Reference:  Baker, Moses N. 1981. The Quest for Pure Water: the History of Water Purification from the Earliest Records to the Twentieth Century. 2nd Edition. Vol. 1. Denver, Co.: American Water Works Association, 125-9.

January 7, 2011:  To prevent overexposure to fluoride, the US Environmental Protection Agency (EPA) and the US Department of Health and Human Services (HHS)  announced proposed changes in the recommended level of fluoride in drinking water. The  HHS proposed recommendation of 0.7 parts per million (ppm) of fluoride in drinking water replaced the current recommended range of 0.7 to 1.2 ppm.

Advertisements

August 29, 1924: Richmond, Virginia Filter Plant Completed

1924 Richmond, Virginia grocery store

August 29, 1924: A complete filtration plant is finally built in Richmond, Virginia. Albert Stein built the first effort to filter a drinking water supply in the U.S. in Richmond in 1832. However the filtration plant was not successful and it was abandoned in 1835. Other efforts were made over the years to treat the Richmond water supply.

“Although Richmond did nothing effective to improve its water supply until well into the twentieth century, settling basins were proposed from time to time. In 1860, the city council asked the superintendent, Davis, and its city engineer, W. Gill, to make plans for a new reservoir “with a proper filter.” They proposed filters cleaned by reverse flow. A new reservoir was put in use January I, 1876. Later, under Superintendent Charles E. Bolling, and the health officer, two narrow settling basins, about a mile long, with provision for drawing off the sediment alternately, were provided. On December 22, 1909, large coagulation basins were added. Chlorination with hypochlorite was begun June 26, 1913, on Levy’s recommendation, following a few cases of typhoid fever in Richmond. In 1914, apparatus for applying liquid chlorine was installed. But not until August 29, 1924, was a complete purification plant available, with coagulation basins, mechanical filters, aerators and a clear-water basin, for the whole of 30-mgd capacity.”

Reference: Baker, Moses N. 1981. The Quest for Pure Water: the History of Water Purification from the Earliest Records to the Twentieth Century. 2nd Edition. Vol. 1. Denver, Co.: American Water Works Association, 130-1.

June 26, 1913: Chlorination in Richmond, VA

Modern Chlorination Facility

June 26, 1913: Hypochlorite addition to disinfect the municipal water supply was initiated in Richmond, VA. Following a typhoid fever outbreak, Dr. E.C. Levy, who was the Chief Health Officer for the City, recommended the addition of hypochlorite. Levy was President of the American Public Health Association in 1923–six years before George W. Fuller.

“In 1914, apparatus for applying liquid chlorine was installed. But not until August 29, 1924, was a complete purification plant available, with coagulation basins, mechanical filters, aerators and a clear-water basin, the whole of 30-mgd capacity.”

Reference: Baker, Moses N. 1981. The Quest for Pure Water: the History of Water Purification from the Earliest Records to the Twentieth Century. 2nd Edition. Vol. 1. Denver, Co.: American Water Works Association, 130.

January 7, 1914: First Transit of Panama Canal; 1832: Richmond Filter; 2011: Fluoride Exposure

SS Ancon first official transit of the Panama Canal in 1914.  The Alexandre La Valley was an old French crane boat that made the first unofficial transit on 1/7/1914.

SS Ancon first official transit of the Panama Canal in 1914. The Alexandre La Valley was an old French crane boat that made the first unofficial transit on 1/7/1914.

January 7, 1914:On January 7, 1914 the Alexandre La Valley became the first ship to make a complete transit of the Panama Canal. The Canal is about 50 miles long and uses a system of locks to transport ships through. The locks are 110 feet wide and 1,000 feet long. Between 13,000 and 14,000 vessels use the canal each year, accounting for about 5% of the world trade….The number of ships able to be processed through is limited by the space available. Larger ships are being built and the locks are limited by size. These forces combined are leading to the Panama Canal Expansion Project. Work began on a new set of locks in 2007 and is expected to be completed by 2014.”

Commentary: The water history connection is that the filling of the locks is accomplished by draining water from Gatun Lake that is fed by precipitation in the Panamanian rain forest. Over 26 million gallons of fresh water is lost to the ocean during each downward lock cycle. The new canal system of locks will recycle about 60 percent of the water so there will be less pressure on the local water resources. A terrific blog posted on October 21, 2012, entitled “Panama Canal Update : Why Water is still King” gave a lot of details on the water resources angle of the new canal. I recommend it.

0126 Moses N BakerJanuary 7, 1832: Completion of the first attempt to filter a public water supply in the U.S. Filtration was begun in Richmond, VA. The slow sand filters operated in an “upflow” mode and consisted of layers of sand and gravel. The design engineer was Albert Stein who built a downflow filter after the upflow version failed. Despite the problems, Moses N. Baker declared the Richmond filtration efforts the start of filtration of public water supplies in the U.S.

Reference: Baker, Moses N. 1981. The Quest for Pure Water: the History of Water Purification from the Earliest Records to the Twentieth Century. 2nd Edition. Vol. 1. Denver, Co.: American Water Works Association, 125-9.

1202 USEPAJanuary 7, 2011: To prevent overexposure to fluoride, the US Environmental Protection Agency (EPA) and the US Department of Health and Human Services (HHS) announced proposed changes in the recommended level of fluoride in drinking water. The HHS proposed recommendation of 0.7 parts per million (ppm) of fluoride in drinking water replaced the current recommended range of 0.7 to 1.2 ppm.

August 29, 1924: Richmond, Virginia Filter Plant Completed

1924 Richmond, Virginia grocery store

1924 Richmond, Virginia grocery store

August 29, 1924: A complete filtration plant is finally built in Richmond, Virginia. Albert Stein built the first effort to filter a drinking water supply in the U.S. in Richmond in 1832. However the filtration plant was not successful and it was abandoned in 1835. Other efforts were made over the years to treat the Richmond water supply.

“Although Richmond did nothing effective to improve its water supply until well into the twentieth century, settling basins were proposed from time to time. In 1860, the city council asked the superintendent, Davis, and its city engineer, W. Gill, to make plans for a new reservoir “with a proper filter.” They proposed filters cleaned by reverse flow. A new reservoir was put in use January I, 1876. Later, under Superintendent Charles E. Bolling, and the health officer, two narrow settling basins, about a mile long, with provision for drawing off the sediment alternately, were provided. On December 22, 1909, large coagulation basins were added. Chlorination with hypochlorite was begun June 26, 1913, on Levy’s recommendation, following a few cases of typhoid fever in Richmond. In 1914, apparatus for applying liquid chlorine was installed. But not until August 29, 1924, was a complete purification plant available, with coagulation basins, mechanical filters, aerators and a clear-water basin, for the whole of 30-mgd capacity.”

Reference: Baker, Moses N. 1981. The Quest for Pure Water: the History of Water Purification from the Earliest Records to the Twentieth Century. 2nd Edition. Vol. 1. Denver, Co.: American Water Works Association, 130-1.

June 26, 1913: Chlorination in Richmond, VA

Modern Chlorination Facility

Modern Chlorination Facility

June 26, 1913: Hypochlorite addition to disinfect the municipal water supply was initiated in Richmond, VA. Following a typhoid fever outbreak, Dr. E.C. Levy, who was the Chief Health Officer for the City, recommended the addition of hypochlorite. Levy was President of the American Public Health Association in 1923–six years before George W. Fuller.

“In 1914, apparatus for applying liquid chlorine was installed. But not until August 29, 1924, was a complete purification plant available, with coagulation basins, mechanical filters, aerators and a clear-water basin, the whole of 30-mgd capacity.”

Reference: Baker, Moses N. 1981. The Quest for Pure Water: the History of Water Purification from the Earliest Records to the Twentieth Century. 2nd Edition. Vol. 1. Denver, Co.: American Water Works Association, 130.26

January 7, 1914: First Transit of Panama Canal; 1832: Richmond Filter; 2011: Fluoride Exposure

SS Ancon first official transit of the Panama Canal in 1914.  The Alexandre La Valley was an old French crane boat that made the first unofficial transit on 1/7/1914.

SS Ancon first official transit of the Panama Canal in 1914. The Alexandre La Valley was an old French crane boat that made the first unofficial transit on 1/7/1914.

January 7, 1914:On January 7, 1914 the Alexandre La Valley became the first ship to make a complete transit of the Panama Canal. The Canal is about 50 miles long and uses a system of locks to transport ships through. The locks are 110 feet wide and 1,000 feet long. Between 13,000 and 14,000 vessels use the canal each year, accounting for about 5% of the world trade….The number of ships able to be processed through is limited by the space available. Larger ships are being built and the locks are limited by size. These forces combined are leading to the Panama Canal Expansion Project. Work began on a new set of locks in 2007 and is expected to be completed by 2014.”

Commentary: The water history connection is that the filling of the locks is accomplished by draining water from Gatun Lake that is fed by precipitation in the Panamanian rain forest. Over 26 million gallons of fresh water is lost to the ocean during each downward lock cycle. The new canal system of locks will recycle about 60 percent of the water so there will be less pressure on the local water resources. A terrific blog posted on October 21, 2012, entitled “Panama Canal Update : Why Water is still King” gave a lot of details on the water resources angle of the new canal. I recommend it.

January 7, 1832: Completion of the first attempt to filter a public water supply in the U.S. Filtration was begun in Richmond, VA. The slow sand filters operated in an “upflow” mode and consisted of layers of sand and gravel. The design engineer was Albert Stein who built a downflow filter after the upflow version failed. Despite the problems, Moses N. Baker declared the Richmond filtration efforts the start of filtration of public water supplies in the U.S.

Reference: Baker, Moses N. 1981. The Quest for Pure Water: the History of Water Purification from the Earliest Records to the Twentieth Century. 2nd Edition. Vol. 1. Denver, Co.: American Water Works Association, 125-9.

January 7, 2011: To prevent overexposure to fluoride, the US Environmental Protection Agency (EPA) and the US Department of Health and Human Services (HHS) announced proposed changes in the recommended level of fluoride in drinking water. The HHS proposed recommendation of 0.7 parts per million (ppm) of fluoride in drinking water replaced the current recommended range of 0.7 to 1.2 ppm.